SKA telescope control system in 2025

WEMG002
24 Sept 2025, 15:03
3m
Grand Ballroom (Palmer House Hilton Chicago)

Grand Ballroom

Palmer House Hilton Chicago

17 East Monroe Street Chicago, IL 60603, United States of America
Poster Presentation with Mini Oral MC01: Project Status Report on New Facilities WEMG Mini-Orals (MC01, MC05, MC10)

Speaker

Ms Sonja Vrcic (SKA Observatory)

Description

It is 2025 and the SKA Telescope Control System has come a long way since the start of construction. The outline of the software architecture and some key technology decisions (including the choice of Tango) were made early. To keep the geographically distributed teams engaged, and avoid creating silos and fragmentation, development of virtually all the software components started in parallel; often while the detailed designs for the custom hardware was still evolving and before the COTS equipment was selected. The deployment strategy was adjusted to align with the industry trends. From designing a software system for hardware that does not exist we arrived at the point where we can prove that the software can actually work with the hardware. However, the software design and implementation meeting reality uncovered some issues, forcing us to make changes (ska-tango-base) and learn hard lessons (naive implementation of event callbacks). Are we ready to deliver a large distributed control system? We realize that scalability will be a challenge. This paper provides an honest overview of what works and what did not work so well, and how we address issues.

Author

Ms Sonja Vrcic (SKA Observatory)

Co-authors

Jarrett Engelbrecht (Vivo Technical) Mr Thomas Juerges (SKA Observatory)

Presentation materials

There are no materials yet.