The new PIP-II super conducting LINAC at Fermilab and its controls status

TUAG006
23 Sept 2025, 09:45
15m
Grand Ballroom (Palmer House Hilton Chicago)

Grand Ballroom

Palmer House Hilton Chicago

17 East Monroe Street Chicago, IL 60603, United States of America
Contributed Oral Presentation MC01: Project Status Report on New Facilities TUAG MC01 Status Reports

Speaker

Daniel Crisp (Fermi National Accelerator Laboratory)

Description

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Funding Agency

This manuscript has been authored by FermiFor-
ward Discovery Group, LLC under Contract No.
89243024CSC000002 with the U.S. Department of

Footnotes

Fermilab Document ID: FERMILAB-SLIDES-25-0242-AD-PIP2

Author

Daniel Crisp (Fermi National Accelerator Laboratory)

Co-authors

Pierrick Hanlet (Fermi National Accelerator Laboratory) William Badgett (Fermi National Accelerator Laboratory)

Presentation materials

There are no materials yet.