Proof of concept of a PLC based emittance meter for the NEWGAIN project

TUMR019
23 Sept 2025, 15:54
3m
Red Lacquer Room (Palmer House Hilton Chicago)

Red Lacquer Room

Palmer House Hilton Chicago

17 East Monroe Street Chicago, IL 60603, United States of America
Poster Presentation with Mini Oral MC08: Diverse Device Control and Integration TUMR Mini-Orals (MC03, MC04, MC08)

Speaker

Clement Hocini (Grand Accélérateur Nat. d'Ions Lourds)

Description

The SPIRAL2 accelerator features several diagnostic devices used to characterize, adjust, and monitor the beam. As part of its NEWGAIN (New GANIL Injector) upgrade project, SPIRAL2 will be equipped with a new source and a new injector. Therefore, new diagnostic tools will be developed, including an ALLISON-type emittance meter. To manage the emittance meter, we opted for a modern industrial PLC solution, leveraging its expanding capabilities and established maintenance advantages over a traditional PLC/VME combination. This paper details the architecture and programming concepts of our proof-of-concept system. It further outlines the test campaign conducted to validate the PLC's capabilities in several key areas: controlling the motors for measurement head positioning within the beam, managing high-voltage ramps, acquiring experimental data, and communicating results to the EPICS control system. The paper will also discuss findings related to current measurement accuracy, measurement rate, and synchronization, as well as the repeatability of the overall measurement process.

Manuscript formatting LaTeX

Author

Clement Hocini (Grand Accélérateur Nat. d'Ions Lourds)

Co-authors

Mr Chaker Maazouzi (Institut Pluridisciplinaire Hubert Curien) Mr Christophe Haquin (GANIL) Christophe Jamet (GANIL) Elian Bouquerel (Institut Pluridisciplinaire Hubert Curien) Mr Philippe Graehling (Institut Pluridisciplinaire Hubert Curien) Pierre Salou (GANIL) Mr Thomas Adam (Institut Pluridisciplinaire Hubert Curien)

Presentation materials

There are no materials yet.