Third and fourth phase update of control network in J-PARC MR

THPD005
25 Sept 2025, 16:15
1h 30m
Palmer House Hilton Chicago

Palmer House Hilton Chicago

17 East Monroe Street Chicago, IL 60603, United States of America
Poster Presentation MC06: Control System Infrastructure and Cyber Security THPD Posters

Speaker

Kenichi Sato (High Energy Accelerator Research Organization)

Description

The control network in J-PARC is a dedicated network that enables to control distributed power supplies and measuring instruments used for the accelerator. It is independent from the office network, but some communications are permitted through a firewall.

The control network consists of a lot of switches:
(a) core switches in the central control building, (b) aggregation switches in each accelerator facility, and (c) edge switches.
The control network started in 2005, and this year, 2025, marks its 20th anniversary. At J-PARC, the network equipment has been updated about every 7 years. The third phase of update began around 2018, and in Main Ring it was completed in 2023.

This report describes how the control network changed from the original design up to the third phase of update. It also discusses the planned fourth phase, including big changes on operation and maintenance support.

Author

Kenichi Sato (High Energy Accelerator Research Organization)

Co-authors

Hiroki Takahashi (Japan Atomic Energy Agency) Norihiko Kamikubota (High Energy Accelerator Research Organization) Shuei Yamada (High Energy Accelerator Research Organization)

Presentation materials

There are no materials yet.