25–30 Aug 2024
Hilton Chicago
America/Chicago timezone

Standardization of ancillary installation tooling for SRF cavities at Fermilab

MOPB057
26 Aug 2024, 16:00
2h
Boulevard (Hilton Chicago)

Boulevard

Hilton Chicago

720 South Michigan Ave Chicago, IL 60605 USA
Poster Presentation MC4.8 Superconducting RF Monday Poster Session

Speaker

Colin Narug (Fermi National Accelerator Laboratory)

Description

For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To try and minimize the amount of tooling sets used, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.

Funding Agency

This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.

Primary author

Colin Narug (Fermi National Accelerator Laboratory)

Co-authors

Mattia Parise (Fermi National Accelerator Laboratory) Iman Salehinia (Northern Illinois University) Leonardo Ristori (Fermi National Accelerator Laboratory) HyeKyoung Park (Fermi National Accelerator Laboratory) Vincent Roger (Fermi National Accelerator Laboratory) Josh Helsper (Fermi National Accelerator Laboratory) Caleb Denton (Northern Illinois University) Donato Passarelli (Fermi National Accelerator Laboratory)

Presentation materials

There are no materials yet.