25–30 Aug 2024
Hilton Chicago
America/Chicago timezone

ESS DTL: final installation and first commissioning results up to 74 MeV

TUPB068
27 Aug 2024, 16:00
2h
Boulevard (Hilton Chicago)

Boulevard

Hilton Chicago

720 South Michigan Ave Chicago, IL 60605 USA
Poster Presentation MC3.4 Proton linac projects Tuesday Poster Session

Speaker

Francesco Grespan (Istituto Nazionale di Fisica Nucleare)

Description

The Drift Tube Linac (DTL) for the European Spallation Source (ESS ERIC) will accelerate proton beam up to 62.5mA peak current from 3.62 to 90 MeV. The 5 cavities are now fully installed and tested in the linac tunnel. Moreover, in 2023 DTL1 to DTL4 have been RF conditioned to full power and beam commissioned with max peak current at short pulses. Relevant results of these activities are presented in this paper.

Primary author

Francesco Grespan (Istituto Nazionale di Fisica Nucleare)

Co-authors

Andrea Pisent (Istituto Nazionale di Fisica Nucleare) Antonio Palmieri (Istituto Nazionale di Fisica Nucleare) Bryan Jones (European Spallation Source ERIC) Dr Carlo Baltador (Istituto Nazionale di Fisica Nucleare) Carlo Mingioni (Istituto Nazionale di Fisica Nucleare) Ciprian Plostinar (European Spallation Source ERIC) Edoardo Nicoletti (Istituto Nazionale di Fisica Nucleare) Laurence Page (European Spallation Source ERIC) Luca Bellan (Istituto Nazionale di Fisica Nucleare) Marco Nenni (Istituto Nazionale di Fisica Nucleare) Maurizio Montis (Istituto Nazionale di Fisica Nucleare) Michele Comunian (Istituto Nazionale di Fisica Nucleare) Natalia Milas (European Spallation Source ERIC) Paolo Mereu (Istituto Nazionale di Fisica Nucleare) Rihua Zeng (European Spallation Source ERIC) Ryoichi Miyamoto (European Spallation Source ERIC) Tina Bencivenga (Istituto Nazionale di Fisica Nucleare) Yngve Levinsen (European Spallation Source ERIC)

Presentation materials

There are no materials yet.