Speaker
Huachang Liu
(Dongguan Neutron Science Center)
Description
The CSNS power upgrade project (CSNS-II) has been launched. It will increase the proton beam power from 100 kW to 500 kW, along with the new construction of 9 neutron instruments. CSNS-II will utilize superconducting accelerator structures to raise the linac energy from 80 MeV to 300 MeV. The pre-research on key technologies has been completed. The newly developed RF ion source is already operational. Prototypes of the dual-spoke and 6-cell elliptical superconducting cavities and their corresponding cryomodules have been developed.
Author
Huachang Liu
(Dongguan Neutron Science Center)