Preparation of the major subsystems is underway for the beam extraction test of the 28 GHz ECR ion source under 18 GHz operating conditions. For the superconducting magnet, ramp-up tests are being conducted to ensure stable operation under the target operating conditions. For plasma generation, the gas injection system and the RF injection system using an 18 GHz klystron are being prepared. Beamline components, such as ESQs and solenoids, are being checked for transport of the extracted beam. An EPICS-based control environment and user interface are being developed for integrated operation of the entire system. This poster summarizes the preparation status of the superconducting magnet, RF system, gas injection system, beamline components, and control system.