Technical commissioning of the ESS linac cavities for the Beam on Dump Phases

Not scheduled
20m
Daejeon Convention Center

Daejeon Convention Center

107 Expo-ro, Yuseong-gu, Daejeon (34125) South Korea
Invited Talk (Invitation Only) MC4.A07: Room temperature RF Invited Talks

Speaker

Marten Koopmans (European Spallation Source)

Description

The ESS linac has been commissioned in two different operation phases operation on the 12 kW commissioning beam dump. In 2025 the linac was operated at full duty cycle in the NCL section (up to 90 MeV) and at reduced duty cycle in the SCL section (up to 870 MeV), due to limitations in the cooling infrastructure and staged implementation of LLRF functionalities. In the present phase the while linac has been operated up to its full duty cycle at 14 Hz and 3.2 ms RF pulses, showing LFD capabilities with long RF pulses in SRF structures.
This contribution summarizes the staged technical commissioning phases, presenting the conditioning experience and the setup for operation at nominal RF performances.

Footnotes

Also relevant for MCR4.A08, SRF

I have read and accept the Privacy Policy Statement Yes

Author

Marten Koopmans (European Spallation Source)

Presentation materials

There are no materials yet.