Speaker
Zhencheng Mu
(Institute of High Energy Physics)
Description
The CSNS has newly developed a metamaterial based 324 MHz klystron with R&D launched in 2021 and successful hot testing in June 2025. The metamaterial-loaded cavities enable 55% shorter structure length, and the integrated second harmonic bunching cavity achieves high efficiency, With 3 MW peak output power and 53.1% efficiency. this report shares the latest development of the metamaterial klystron.
| I have read and accept the Privacy Policy Statement | Yes |
|---|
Author
Zhencheng Mu
(Institute of High Energy Physics)