16–21 Aug 2026
Daejeon Convention Center
Asia/Seoul timezone

PIP-II PROJECT PROGRESS AND CHALLENGES

Not scheduled
20m
Daejeon Convention Center

Daejeon Convention Center

107 Expo-ro, Yuseong-gu, Daejeon (34125) South Korea
Invited Talk (Invitation Only) MC3.A04: Proton linac projects Invited Talks

Speaker

Dr Olivier Napoly (Fermi National Accelerator Laboratory)

Description

The PIP-II Project is under construction to provide the Fermilab Accelerator Complex with a new H- SRF linac and beam transfer line delivering 800 MeV protons at Booster injection at double energy and double intensity (6.7x1012 proton per 20 Hz pulse) in comparison with the present Linac.
The design goals of PIP-II Linac will be described, including delivering 1.2 kW beam power on LBNF/DUNE target, CW operation compatibility and future upgrades.
The progress of the Linac construction and the development of the Commissioning Plan will be presented.
Finally, the challenges of operating the SRF Linac to drive the Fermilab Booster will be addressed.

Funding Agency

US Department of Energy

I have read and accept the Privacy Policy Statement Yes

Author

Dr Olivier Napoly (Fermi National Accelerator Laboratory)

Presentation materials

There are no materials yet.