16–21 Aug 2026
Daejeon Convention Center
Asia/Seoul timezone

Beam commissioning of the linear accelerator of the SKIF Synchrotron Radiation Facility

Not scheduled
2h
Daejeon Convention Center

Daejeon Convention Center

107 Expo-ro, Yuseong-gu, Daejeon (34125) South Korea
Poster Presentation MC1.A01: Beam Dynamics, beam simulations, beam transport Poster Session

Speaker

Mariya Arsentyeva (Synchrotron Radiation Facility — Siberian Circular Photon Source «SKIF» Boreskov Institute of Catalysis)

Description

Linear accelerator of the SKIF Synchrotron Radation Facility (SRF SKIF) was sucessfully commissioned in 2025. It provides the electron beams with the energy of 200 MeV for the subsequent injection to the booster synchrotron. Being an initial part of the SRF SKIF, the linear accelerator includes not only the key components, such as the electron gun, accelerating structures and magnet elements, but also a large variety of auxiliary systems. We give an overview of the linac commissioning details together with the operation features.

I have read and accept the Privacy Policy Statement Yes

Author

Mariya Arsentyeva (Synchrotron Radiation Facility — Siberian Circular Photon Source «SKIF» Boreskov Institute of Catalysis)

Presentation materials

There are no materials yet.