7–11 Sept 2025
Teaching Hub 502
Europe/London timezone

Initial implementation of a new orbit feedback system using MicroTCA.4 for the PF user operations

TUPMO25
9 Sept 2025, 16:00
2h
Teaching Hub 502

Teaching Hub 502

The University of Liverpool 160 Mount Pleasant L3 5TR Liverpool
Poster Presentation MC06: Feedback Systems and Beam Stability TUP

Speaker

Ryota Takai (High Energy Accelerator Research Organization)

Description

A new orbit feedback system has been introduced to the PF-ring, a synchrotron radiation source at KEK, starting from the third operation period of FY2024. The new system is built with state-of-the-art digital signal processing circuits based on the MicroTCA.4 standard. The stored beam’s closed orbit distortion (COD) is measured at a 10 kHz rate using the circuits matched to the number of BPMs, and corrected to a designated reference orbit by feeding back the results of matrix calculations using the inverse response matrix to the currents of fast steering magnets. The transition from the legacy VME-based system, which had been in service for nearly 30 years, was carried out carefully and stepwise during the startup phase of the third operation period. The reference orbit was successfully transferred to the new system, and even in-vacuum undulators with a minimum gap of 4 mm were operated without requiring additional orbit corrections. In this presentation, we will describe the setup of the newly implemented system, the transition process from the old system, and plans for future improvements.

I have read and accept the Conference Policies Yes

Author

Ryota Takai (High Energy Accelerator Research Organization)

Co-authors

Hidenori Sagehashi (High Energy Accelerator Research Organization) Mami Shiozawa (High Energy Accelerator Research Organization) Mikoto Tadano (High Energy Accelerator Research Organization) Takashi Obina (High Energy Accelerator Research Organization)

Presentation materials

There are no materials yet.