7–11 Sept 2025
Teaching Hub 502
Europe/London timezone

Design strategy of the Frontend Blade X-ray Beam Position Monitors (FEXBPM) based on the MAX IV experience.

WEPMO24
10 Sept 2025, 16:00
2h
Teaching Hub 502

Teaching Hub 502

The University of Liverpool 160 Mount Pleasant L3 5TR Liverpool
Poster Presentation MC03: Beam Position Monitors WEP

Speaker

Petr Ilinski (MAX IV Laboratory)

Description

An overview of performance and operation of Blade FEXBPMs installed at the MAX IV R3 storage ring frontends will be presented.
FEXBPM design, position calibration techniques, normalization to the storage ring current, resolution and some deficiencies of the operation will be discussed.
Suggestions for design strategy of the Blade FEXBPMs and overall improvements of the FEXBPM based on extensive Blade FEXBPM signal modeling will be presented.

I have read and accept the Conference Policies Yes

Author

Petr Ilinski (MAX IV Laboratory)

Presentation materials

There are no materials yet.