Speaker
Laura Torino
(ALBA Synchrotron (Spain))
Description
In the context of building the next generation of synchrotron light sources, significant effort has been directed towards developing BPM buttons. The design of these components needs to consider several factors related to the miniaturization of the beam pipe and the broadening of the beam spectrum, while still guaranteeing high resolution for commissioning and feedback purposes. A workshop was held in December 2024 at ALBA light source organized in collaboration with DESY, aiming to bring together experts from various light sources to share their experiences on the different stages of the deployment process, from simulation to manufacturing and characterization. This presentation reviews the key topics presented at the workshop.
I have read and accept the Conference Policies | Yes |
---|
Author
Laura Torino
(ALBA Synchrotron (Spain))
Co-authors
Dirk Lipka
(Deutsches Elektronen-Synchrotron DESY)
Gero Kube
(Deutsches Elektronen-Synchrotron DESY)
Silke Vilcins
(Deutsches Elektronen-Synchrotron DESY)
Ubaldo Iriso
(ALBA Synchrotron (Spain))