1–6 Jun 2025
Taipei International Convention Center (TICC)
Asia/Taipei timezone

Mechanical displacement of the prototype chamber for the Korea-4GSR

THPB072
5 Jun 2025, 15:30
2h
Exhibiton Hall A _Bear (TWTC)

Exhibiton Hall A _Bear

TWTC

Poster Presentation MC7.T14 Vacuum Technology Thursday Poster Session

Speaker

Jaehoon Kim (Pohang Accelerator Laboratory)

Description

The Korea-4GSR storage ring vacuum chamber is composed of materials such as aluminum and stainless steel. Among these, the aluminum extruded chamber for Pill getter insertion undergoes in-situ bake-out and getter activation in the storage ring tunnel at a temperature of 180°C for over 24 hours. The gap between the electromagnet and the vacuum chamber is as narrow as 1–2 mm, which could lead to physical interference between the magnet and the chamber due to thermal expansion caused by the bake-out process. Therefore, the displacement of the aluminum vacuum chamber due to temperature increase has been calculated and measured based on the position and type of supports. This presentation aims to discuss the optimization of the bellows and support designs for the aluminum vacuum chamber.

Region represented Asia
Paper preparation format Word

Author

Jaehoon Kim (Pohang Accelerator Laboratory)

Co-authors

Hosun Choi (Pohang Accelerator Laboratory) Mansoo Hong (Pohang Accelerator Laboratory) Sehyun Kim (Pohang Accelerator Laboratory) Taekyun Ha (Pohang Accelerator Laboratory)

Presentation materials

There are no materials yet.