1–6 Jun 2025
Taipei International Convention Center (TICC)
Asia/Taipei timezone

Transient beam loading studies at ALBA

WEPS055
4 Jun 2025, 16:00
2h
Exhibiton Hall A _Salmon (TWTC)

Exhibiton Hall A _Salmon

TWTC

Poster Presentation MC7.T06 Normal Conducting RF Wednesday Poster Session

Speaker

Francis Perez (ALBA Synchrotron (Spain))

Description

The bunch lengthening performance of harmonic RF systems is significantly affected by gaps in the filling pattern, which induce a transient beam loading effect (TBL). To optimize the performance of the active harmonic system planned for the upgrade of ALBA storage ring, strategies to mitigate TBL under worst-case gap scenarios are being investigated. The primary approach involves employing additional generator power both in the main and harmonic systems to compensate for beam voltage variations caused by the gap, thereby flattening the total voltage signal and enabling longer average bunch lengths. A semi-analytical model has been developed to support this effort, validated through tracking simulations and machine studies. This paper presents the key findings and implications of these results.

Region represented Europe
Paper preparation format LaTeX

Author

Ignasi Bellafont (ALBA Synchrotron (Spain))

Co-authors

Francis Perez (ALBA Synchrotron (Spain)) Ignacio Serrano (ALBA Synchrotron (Spain)) Jesus Ocampo (ALBA Synchrotron (Spain)) Jordi González de Regàs (ALBA-CELLS Synchrotron (ALBA-CELLS)) Mr Pol Solans (ALBA Synchrotron (Spain)) Seyd Hamed Shaker (ALBA Synchrotron (Spain))

Presentation materials

There are no materials yet.