1–6 Jun 2025
Taipei International Convention Center (TICC)
Asia/Taipei timezone

Operation status of superconducting RF system in SuperKEKB with high beam current

WEPB007
4 Jun 2025, 16:00
2h
Exhibiton Hall A _Bear (TWTC)

Exhibiton Hall A _Bear

TWTC

Poster Presentation MC7.T07 Superconducting RF Wednesday Poster Session

Speaker

Michiru Nishiwaki (High Energy Accelerator Research Organization)

Description

SuperKEKB continues the operation with the aim of achieving high luminosity. The beam current has already exceeded 1.3 A in the electron ring and 1.6 A in the positron ring. Eight superconducting RF (SRF) systems are operating in the electron ring. The SRF system including cavities, input couplers, HOM dampers, and so on was designed for KEKB and modified to handle the higher beam current of SuperKEKB. The SRF system is operating stably without any major problems. There are many issues that need to be resolved, such as large beam power and HOM power increasing with beam current, and various risks of failure due to aging of the system. To maintain the stable operation of the SRF system, it is important to establish an anomaly diagnosis system and methods for measuring and recovering the performance of the system. We will report on the operating status of the SRF system in the high beam current and countermeasures for the issues

Region represented Asia
Paper preparation format LaTeX

Author

Michiru Nishiwaki (High Energy Accelerator Research Organization)

Co-authors

Kazunori Akai (High Energy Accelerator Research Organization) Shinji Mitsunobu (High Energy Accelerator Research Organization) Takaaki Furuya (High Energy Accelerator Research Organization) Takafumi Okada (High Energy Accelerator Research Organization) Tetsuya Kobayashi (High Energy Accelerator Research Organization) Yoshiyuki Morita (High Energy Accelerator Research Organization)

Presentation materials

There are no materials yet.