Characterisation of the foreseen turn-by-turn beam position instrumentation for the cSTART storage ring

THPS094
5 Jun 2025, 15:30
2h
Exhibiton Hall A _Salmon (TWTC)

Exhibiton Hall A _Salmon

TWTC

Poster Presentation MC6.T03 Beam Diagnostics and Instrumentation Thursday Poster Session

Speaker

Anton Malygin (Karlsruhe Institute of Technology)

Description

The KIT cSTART project (compact storage ring for accelerator research and technology) aims to demonstrate injection and storage of a high intensity ultra-short bunch using the FLUTE LINAC, as well as a laser-plasma accelerator (LPA).
cSTART is planned to operate with a wide range of demanding parameters, such as bunch charge, bunch length and energy spread (from the LPA), making it extremely challenging for the choice of beam diagnostics with large dynamic ranges that are capable of operating within specifications.
Moreover, turn by turn measurements are necessary in the cSTART storage ring as bunch characteristics are expected to dramatically change within a single turn.
In this paper, we will describe the planned beam diagnostics system of the cSTART storage ring focusing on the turn-by-turn signal processing and reporting on characterization tests which were performed.

Region represented Europe
Paper preparation format LaTeX

Author

Dima El Khechen (Karlsruhe Institute of Technology)

Co-authors

Anke-Susanne Mueller (Karlsruhe Institute of Technology) Anton Malygin (Karlsruhe Institute of Technology) Johannes Steinmann (Karlsruhe Institute of Technology) Matthias Fuchs (Karlsruhe Institute of Technology) Nigel Smale (Karlsruhe Institute of Technology) Peter Leban (Instrumentation Technologies (Slovenia)) Robert Ruprecht (Karlsruhe Institute of Technology)

Presentation materials

There are no materials yet.