Skip to main content
1–6 Jun 2025
Taipei International Convention Center (TICC)
Asia/Taipei timezone

Daily performance variations of the LCLS-II super conducting accelerator

THPS031
5 Jun 2025, 15:30
2h
Exhibiton Hall A _Salmon (TWTC)

Exhibiton Hall A _Salmon

TWTC

Poster Presentation MC6.T22 Reliability, Operability Thursday Poster Session

Speaker

Franz-Josef Decker (SLAC National Accelerator Laboratory)

Description

Starting with user delivery it was noticed that the FEL intensity performance varied by up to a factor of two during the day. Three injector RF phases for the laser, the gun, and the buncher were not stabilized with a forward and reversed reference signals like the rest of the RF feeding the Cryo-Modules, making them the prime candidates for daily phase drifts. Combining the signals in hardware, firmware and software and temperature stabilizing critical RF cables improved the situation. Additionally, how downstream beam parameters like energy, bunch length, and orbits respond to phase changes of laser, gun, and buncher were quantified, so that the observed daily changes could be attributed to the most likely combination of still uncorrected phase drifts. A feed-forward system similar to the RF of the copper linac using the local temperature was developed to compensate for the remaining changes. Longitudinal feedbacks should see minimal amounts for intervention.

Region represented America
Paper preparation format Word

Author

Franz-Josef Decker (SLAC National Accelerator Laboratory)

Co-authors

Andrew Benwell (SLAC National Accelerator Laboratory) Bo Hong (SLAC National Accelerator Laboratory) Christopher Zimmer (SLAC National Accelerator Laboratory) Garth Brown (SLAC National Accelerator Laboratory) William Colocho (SLAC National Accelerator Laboratory) Yuantao Ding (SLAC National Accelerator Laboratory)

Presentation materials

There are no materials yet.