Speaker
Description
KEK Accelerator Test Facility (ATF) conducts beam instrumentation R&D for International Linear Collider (ILC) project. ATF includes 1.3 GeV normal conductivity S-band Linac and Damping Ring (DR). There are 9 S-band pulsed klystrons at Linac, which supply High-Power RF to accelerate electron beam up to 1.3 GeV, 1 CW klystron at DR. The electron beam is generated by a photocathode irradiation by a laser pulse. The laser pulse generation is synchronized with the accelerating fields by the laser system oscillator Piezo feedback. These Linac, DR High-Power RF field and laser pulse arrival time jitter and/or drift define the stability of the electron beam parameters, such as average energy, energy spread (RMS), emittance, bunch charge etc. This study demonstrates KEK ATF Linac and DR High-Power RF field phase and amplitude, as well as the laser system oscillator laser pulse arrival stability measurement results. Also, FPGA board based digital Low-Level RF phase&litude feedback system is described in this report.
Region represented | Asia |
---|---|
Paper preparation format | LaTeX |