Kyushu University
Author in the following contributions
- Consideration for improving the longitudinal beam matching between RCS and MR at the J-PARC
- Bunch lengthening of the extraction beam using second harmonic in J-PARC RCS
- Present status of RF system upgrade in the J-PARC MR
- Estimation of the required current on the anode power supply for high power operation in the J-PARC Main Ring