Speaker
Dr
Hidefumi Okita
(Japan Atomic Energy Agency)
Description
The J-PARC 3 GeV Rapid-Cycling Synchrotron (RCS) delivers the high-intensity proton beam to the 30 GeV Main Ring (MR). The improvement of longitudinal beam matching between RCS and MR is desired to suppress the beam loss in the MR. A scenario to improve the longitudinal beam matching between RCS and MR is designed. For the RCS, the bunch lengthening scheme using the unstable fixed point generated by the second harmonic is considered. For the MR, the RF voltage pattern is adjusted to match the longitudinal beam emittance of the RCS. The details of the scenario for improving the longitudinal beam matching between RCS and MR and the results of beam simulation studies are reported.
Region represented | Asia |
---|---|
Paper preparation format | LaTeX |
Author
Dr
Hidefumi Okita
(Japan Atomic Energy Agency)
Co-authors
Chihiro Ohmori
(Japan Proton Accelerator Research Complex)
Fumihiko Tamura
(Japan Atomic Energy Agency)
Katsushi Hasegawa
(High Energy Accelerator Research Organization)
Keigo Hara
(High Energy Accelerator Research Organization)
Kyosuke Adachi
(Kyushu University)
Masahiro Nomura
(Japan Atomic Energy Agency)
Masahito Yoshii
(High Energy Accelerator Research Organization)
Ryosuke Miyakoshi
(Japan Proton Accelerator Research Complex)
Taihei Shimada
(Japan Atomic Energy Agency)
Yasuyuki Sugiyama
(High Energy Accelerator Research Organization)