Speaker
Anny Gora
(Helmholtz-Zentrum Berlin für Materialien und Energie)
Description
A permanently running energy measurement based on resonant spin depolarization of the electron beam has been implemented at BESSY II for several years.
In order to move towards long-term energy stability and to be able to use the method for different applications, for example the determination of the momentum compaction factor, the present measurement time of almost four hours should be significantly shortened. Therefore, the method has been systematically investigated with the aim of optimising it for faster measurement. This involved studying the beam parameters as well as the parameters of the excitation system. According to the studies, reliably measuring the beam energy every (15-30) minutes seems to be realistic.
Region represented | Europe |
---|---|
Paper preparation format | LaTeX |
Author
Anny Gora
(Helmholtz-Zentrum Berlin für Materialien und Energie)
Co-authors
Andreas Schaelicke
(Helmholtz-Zentrum Berlin für Materialien und Energie)
Guenther Rehm
(Helmholtz-Zentrum Berlin für Materialien und Energie)
Markus Ries
(Helmholtz-Zentrum Berlin für Materialien und Energie)