Speaker
Michael Bousonville
(Deutsches Elektronen-Synchrotron DESY)
Description
In the period from October 2021 to August 2024, a cavity was developed for the 3rd harmonic system of PETRA IV. The development has progressed so far that a complete CAD model already exists. The cavity design has been reviewed by an external expert and approved. The project team is now working on clarifying the final details of the design and preparing all the technical documentation for the production of the cavity. This article reports on the issues that need to be addressed in order to turn the simulation and CAD model into a real, fully functional cavity.
Region represented | Europe |
---|---|
Paper preparation format | Word |
Author
Michael Bousonville
(Deutsches Elektronen-Synchrotron DESY)
Co-authors
Chris Christou
(Deutsches Elektronen-Synchrotron DESY)
Peter Hülsmann
(Deutsches Elektronen-Synchrotron DESY)
Silke Vilcins
(Deutsches Elektronen-Synchrotron DESY)
Simon Karau
(Deutsches Elektronen-Synchrotron DESY)